From May through the summer months, the Benjamin Franklin Bridge is open until 9 p.m. To coincide with the later time and to allow for people who have later schedules to run the bridge, the Wednesday Bridge Run will use a summer schedule of 7 p.m. starting on May 7, 2014 and running through August 27, 2014.
Summer Schedule of 7 P.M. for Bridge Run Starting on May 7
This entry was posted in Group Runs and tagged Benjamin Franklin Bridge, Bridge Run. Bookmark the permalink.
